Solfuture.

Get Your Accurate Quote

Your quote within 1 business day

Upload your latest bill and site photos. We’ll prepare your quote once the required details are complete.

For faster uploads, aim for 20 MB or less in total. Maximum 50 MB across all sections.

Latest electricity bill

Upload all pages. Keep usage, tariffs and supply address visible.

Switchboard photos

  1. Whole board + nearby wall
  2. MAIN SWITCH: label and rating
  3. Breaker ratings + circuit labels

Take these three views:

  1. Whole board + surrounding wall.
  2. Close-up of MAIN SWITCH.
  3. Close-up of breaker ratings & labels.

Photograph only. Do not operate switches or remove covers.

Battery installation location

Choose a preferred position and photograph the whole wall and ground, including nearby doors or windows.

Preferred battery location

Check your proposed spot

  • Solid and sheltered. Choose a solid wall or suitable base in a dry spot, sheltered from direct sun and rain.
  • Nearby openings. Show doors, windows, vents and drains in your photos.
  • Nearby equipment and materials. Include gas meters, gas pipes, timber structures, fences and stored items.
  • Clear access. Leave space for airflow, installation and servicing. Keep walkways clear.
  • Vehicle access. Show nearby parking spaces or vehicle paths.
  • Room behind the wall. Tell us what’s on the other side, such as a bedroom, living room, kitchen, bathroom or laundry.

Your installer will confirm the final position, clearances and protection for your battery model.

Cable run

Estimate the cable route along walls and corners from the switchboard to the battery.

Contact & address

0.0 MB selected · 50 MB maximum

Recommended: 20 MB total or less for faster uploads.